The installation of APP bitumen membrane consists of several key steps. Below is a general outline of the procedure:
Thoroughly clean and dry the surface designated for membrane application, removing all debris, dust, and loose materials. Level any uneven areas or imperfections.
Apply a bitumen primer to the surface to enhance the membrane’s adhesion to the substrate.
Unroll and position the membrane onto the prepared surface. Ensure end laps overlap by at least 3 inches and side laps by a minimum of 4 inches. Trim the membrane to size and roll it back to prepare for adhesive application.
Heat the membrane and substrate using a propane torch. Apply adhesive to the substrate with a trowel or spray equipment. Roll the membrane back into place and press it firmly onto the adhesive.
Fuse the overlapping seams of adjacent membrane sheets with a propane torch to activate the adhesive and create a strong, waterproof bond.
Secure the membrane’s edges with a termination bar or flashing to achieve a watertight seal around the roof’s perimeter.